Step 3: Verifying Proper Operation
After the wake-up time is over, a status screen similar to the following appears on the inverter LCD panel:
V a c [ V ] V d c [ V ] P a c [ W ]
2 4 0 . 7
3 7 1 . 9
2 3 4 9 . 3
P _ O K : X X X / Y Y Y < S _ O K >
. . . . . . . . . . . . . . . . .
O N
1. Verify the following:
l
The green inverter LED is steadily lit.
l
The ON/OFF indicator on the LCD panel reads
ON
.
l
P_OK: XXX/YYY
: There is a connection to the power optimizers and at least one power optimizer is
sending monitoring data. Optimizers send telemetries in a frequency of up to 10 minutes. Initially after
pairing, both XXX and YYY values show 000 and the values increase as paired power optimizers are
reported.
NOTE
It may take up to 20 minutes for all power optimizers to transmit their telemetries and to be counted
on the LCD screen.
l
S_OK
appears, if the inverter is connected to the SolarEdge monitoring portal.
l
Vac [V]
specifies the measured grid AC output voltage.
l
Vdc [v]
: Specifies the DC input voltage, which should equal the sum of the output voltages of all
modules (and should be within the operating range of the inverter).
l
Pac [W]
specifies the total AC output power produced.
2. Take note of the serial # on the inverter label using the detachable 2D barcode sticker on each device.
This information is used in the SolarEdge monitoring portal to identify this inverter and is needed to
open a new site in the monitoring portal.
Your SolarEdge power harvesting system is now operational.
Step 4: Reporting and Monitoring Installation Data
NOTE
This step requires connecting one of the communication options. Refer to
Setting Up
Communication to the Monitoring Portal
on page 71.
The SolarEdge Monitoring System
The SolarEdge monitoring portal enables accessing SolarEdge site information, including up-to-date
information viewed in a physical or logical view.The monitoring portal is described in detail in the
SolarEdge
Monitoring Portal User Guide
, available on the SolarEdge website at
http://www.solaredge.us/files/pdfs/solaredge-monitoring-portal-user-guide.pdf
. The SolarEdge
monitoring portal can display logical and physical layouts of the installed system, as follows:
l
Logical Layout
: Shows a schematic logical layout of the components in the system, such as: inverters,
strings and modules, as well as their electrical connectivity. This view enables you to see which
modules are connected in each string, which strings are connected to each inverter, and so on.
l
Physical Layout
: Shows a schematic physical layout of the components in the system, such as:
inverters, strings and modules, as well as their electrical connectivity. This view enables a bird’s eye
view of the actual location of a system component.
SolarEdge
-
StorEdge Installation Guide MAN-01-00262-1.0
60
Step 3: Verifying Proper Operation
Содержание storedge
Страница 1: ...SolarEdge StorEdge Installation Guide For North America Version 1 0 ...
Страница 95: ......