Step 2: Pairing Power Optimizers to the Inverter
Once all connections are made, all the power optimizers must be logically paired to their inverter. The
power optimizers do not start producing power until they are paired with an inverter . This step
describes how to assign each inverter to the power optimizers from which it will produce power.
Perform this step when the modules are exposed to sunlight. If the string length is changed or a power
optimizer is replaced, repeat the pairing process.
1. Perform pairing: Press and hold down the inverter LCD button for about
10 seconds
. The following
message is displayed:
K e e p h o l d i n g b u t t o n
f o r p a i r i n g , r e l e a s e
t o e n t e r m e n u . . .
R e m a i n i n g :
3 s e c
Keep holding for 5 seconds until the following is displayed:
P a i r i n g
T u r n S w i t c h T o O n
2. Turn the inverter ON/OFF switch to ON within 5 seconds. If you wait longer than 5 seconds the
inverter exits the pairing mode. The following message is displayed indicating that the inverter is
performing the pairing:
P a i r i n g
R e m a i n i n g [ s e c ] : 1 8 0
SolarEdge
-
StorEdge Installation Guide MAN-01-00262-1.0
58
Step 2: Pairing Power Optimizers to the Inverter
Содержание storedge
Страница 1: ...SolarEdge StorEdge Installation Guide For North America Version 1 0 ...
Страница 95: ......