Chapter 5: Electricity Meter Installation
The StorEdge solution requires connecting a meter for Smart Energy Management applications, such as
maximizing self-consumption.
For backup power only, installing a meter is not required
.
The meter is connected to the inverter using RS485.
NOTE
The inverter RS485 bus should be connected to the battery and meter. Connecting multiple inverters
with RS485 master-slave connection requires an RS485 Expansion Kit (available form SolarEdge
Refer to
http://www.solaredge.com/files/pdfs/RS485_expansion_kit_installation_guide.pdf
).
To install the SolarEdge meter refer to the installation guide supplied with it:
http://www.solaredge.com/files/pdfs/solaredge-meter-installation-guide-na.pdf
.
For communication connection refer to
Connecting Communication to the Meter
on page 37.
SolarEdge
-
StorEdge Installation Guide MAN-01-00262-1.0
26
Chapter 5: Electricity Meter Installation
Содержание storedge
Страница 1: ...SolarEdge StorEdge Installation Guide For North America Version 1 0 ...
Страница 95: ......