8. Select
Battery Info
and check the battery information:
S N : < s e r i a l # >
M o d e l : < X X X X X X >
R a t e d P W R [ k W H ] : N / A
F W V e r . < X X X X X >
To verify the connection:
1. Press the inverter external LCD light button to display the status screens one after the other:
a. Check the RS485 communication status:
w w w w w w w w
D e v P r o t # #
R S 4 8 5 - 1 < M L T > < 0 2 > < 0 2 >
l
The number under
Prot
(protocol) should display the number of
configured
devices.
l
The number under ## should display the number of
communicating
devices.
The above screen shows an example of 2 devices on the same bus (e.g. meter and battery). If
RGM is pre-installed, and a battery and an external meter are also installed, the screen should
show <3><3>.
If the number of devices under Prot does not match the number under ##, refer to
Troubleshooting
on page 79
b. Check the meter(s): In the meter(s) status screen check that the status is
OK
. The following is an
example of the status of an Export (or Import) meter:
E x p o r t M e t e r
S t a t u s : < O K >
< E r r o r M e s s a g e >
T o t a l [ W h ] : X X X X X X X
If
Comm. Error
appears, refer to
Troubleshooting
on page 79.
c. Check the battery information: identification, charging status and power, and the operating
mode.
B S N : X X X X X X X X X I D : 2 4
S O E : 8 9 %
W W W W W
P W R : 0 W
T o t a l : 0 W h
S t a t e : I d l e
If
Comm. Error
appears, refer to
Troubleshooting
on page 79.
SolarEdge
-
StorEdge Installation Guide MAN-01-00262-1.0
64
Configuring the RS485 Bus for Battery and Meter Connection
Содержание storedge
Страница 1: ...SolarEdge StorEdge Installation Guide For North America Version 1 0 ...
Страница 95: ......