Verifying the Connection
After connecting and configuring a communication option, perform the following steps to check that
the connection to the monitoring server has been successfully established.
1. Close the inverter cover: Attach the inverter cover and secure it by tightening the screws with a
torque of 9.0 N*m/ 6.6 lb.*ft. For proper sealing, first tighten the corner screws and then the two
central screws (see also
Figure 28
).
2. Turn ON the AC to the inverter by turning ON the circuit breaker on the main distribution panel and
turning on the Safety Switch.
3. Wait for the inverter to connect to the SolarEdge monitoring portal. This may take up to two
minutes.
A status screen similar to the following appears on the LCD panel:
V a c [ V ] V d c [ V ] P a c [ w ]
2 4 0 . 7
1 4 . 1
0 . 0
P _ O K : 0 0 0 / 0 0 0 < S _ O K >
- - - - - - - - - - - - - - -
O F F
S_OK
: Indicates that the connection to the SolarEdge monitoring portal is successful. If S_OK is not
displayed, refer to
"Troubleshooting" on the facing page.
SolarEdge
-
StorEdge Installation Guide MAN-01-00262-1.0
78
Verifying the Connection
Содержание storedge
Страница 1: ...SolarEdge StorEdge Installation Guide For North America Version 1 0 ...
Страница 95: ......