2. To set a minimum battery charge level, so that the battery will always have energy stored in case
backup power is needed, do the following:
a. From the
Energy Manager
menu select
Storage Control
. The following is displayed:
B a c k u p R S V D < % P V >
b. Select
Backup RSVD
and set the required level as precentage of the battery capacity:
o
For backup power + Smart Energy Management - according to user requirement
o
For backup-only - according to battery manufacturer recommendation, if provided
Verifying StorEdge Components Functionality
Upon installation and configuration completion, the system should be operating according to the
selected StorEdge application.
This section describes how to verify that all system components are functioning as expected. If not, refer
to
Troubleshooting
on page 79.
To check the inverter and meter:
1. Turn the AC ON.
2. Check the meter (installed in export or consumption position, CT arrows point to the grid):
a. Turn the inverter ON/OFF switch to OFF.
b. Turn loads ON on all of the measured phases.
c. Press the external LCD light button to display the Import or Consumption meter status screen,
and check that the import or consumption energy (Total [Wh]) is advancing (may take a few
minutes, depending on the loads size):
I m p o r t M e t e r
S t a t u s : < O K >
< E r r o r M e s s a g e >
T o t a l [ W h ] : X X X X X X X
d. Press the LCD light button to display the Export meter status screen, and check that the Export
energy (Total [Wh]) is not advancing: (If export is advancing check the CTs direction.)
3. Turn the inverter ON/OFF switch to ON.
4. Turn the StorEdge Connection Unit switch to ON.
5. While the modules are exposed to sunlight (PV system is connected to the grid and the inverter is
producing power), press the inverter LCD light button to display the power status screen, and check
that the grid AC output (Vac) increases to 220-240V, and the total AC output power produced (Pac):
V a c [ V ] V d c [ V ] P a c [ W ]
2 4 0 . 7
w
3 7 1 . 9
2 3 4 9 . 3
P _ O K : X X X / Y Y Y < S _ O K >
. . . . . . . . . . . . . . . . .
O N
To check Maximum Self-consumption mode:
1. Turn on as many loads to ensure that consumption is greater than the inverter AC rating.
2. If the meter is installed at the grid connection point you can check that the import energy is
advancing (may take a few minutes, depending on the loads size): Press the inverter LCD light button
SolarEdge
-
StorEdge Installation Guide MAN-01-00262-1.0
68
Verifying StorEdge Components Functionality
Содержание storedge
Страница 1: ...SolarEdge StorEdge Installation Guide For North America Version 1 0 ...
Страница 95: ......