13. Place the ferrite beads on the wires and close them. Make sure the DC labeled ferrite bead is placed on
the DC wires and the AC labeled ferrite bead is placed on the AC wires.
14. Close the inverter cover.
15. Configure the system to the required application as described in
System Configuration
on page 62
16. Perform the commissioning steps as described in
Commissioning the Installation
on page 55.
9V Battery Replacement
If Warning 8:
Connection Unit Low 9V Battery
is displayed in the main status screen, replace the 9V
battery in the StorEdge Connection Unit.
1. Turn OFF the inverter ON/OFF switch, and wait until the LCD indicates that the DC voltage is safe
(<50V), or wait five minutes before continuing to the next step.
WARNING!
If you cannot see the inverter panel, or if a malfunction is indicated on the LCD panel, wait five
minutes for the input capacitors of the inverter to discharge.
Si vous ne pouvez pas voir l'écran de l'onduleur ou si un dysfonctionnement est indiqué sur
l'écran LCD, attendez cinq minutes pour que les condensateurs d'entrée de l'onduleur soient
déchargés.
2. Turn OFF the StorEdge Connection Unit and the AC switch of the distribution panel.
3. Open and remove the StorEdge Connection Unit cover.
4. Open and remove the transparent internal cover.
5. Remove the battery from the upper board of the StorEdge Connection Unit and replace with a new
standard 9V battery.
6. Close the StorEdge Connection Unit covers.
Figure 42: The battery holder
Appendix B: Replacing and Adding System Components
SolarEdge
-
StorEdge Installation Guide MAN-01-00262-1.0
91