20/11/2020
27/88
E_MH_Installation_instructions_Skylux_Climax
Gutter
Multiple gutter elements can be connected to each other for gutter lengths > 7 metres. A gutter support must be
installed at every gutter connection point. We recommend tilting the profiles and supporting the gutter support
connections when using a gutter and gutter support (GD1.GD2) combination.
The gutter profiles can be linked using connection pins 909 and/or connector profile GI.
Use silicone glue SG20 as sealant.
A raised profile GR can be installed on the gutter G. Position
the side gutter slide ends first and subsequently fasten the
GR profile on to the gutter every 500 mm.
The gutter slide ends must be pre-installed using self-drilling
ZGS screws if the gutter is installed between two walls (for
example with a gutter bracket).
Place the pre-assembled gutter on the posts and fasten the
structure using coated ZSG screws.
GC
SG20
SG20
909
909
G
GI
909
Install the outlet in the gutter opening and seal
using silicone.
G + GI + SG20 + 909 (3x)
20
40
ZSG (4x)
GDC
ZSG
ZSG
500
GR
Содержание Climax 36178
Страница 1: ...CANOPY Climax Installation instructions Self supporting aluminium profile system EN Art N 36178...
Страница 85: ...20 11 2020 85 88 E_MH_Installation_instructions_Skylux_Climax...
Страница 86: ...E_MH_Installation_instructions_Skylux_Climax 20 11 2020 86 88...
Страница 87: ...20 11 2020 87 88 E_MH_Installation_instructions_Skylux_Climax...