20/11/2020
25/88
E_MH_Installation_instructions_Skylux_Climax
Gutter GD1 + G + Y10
Assemble the gutter components to prepare for the installation of the gutter.
Connect the gutter (G) to the gutter
support (GD1) using the Y10.
Slide in the hinge profile (S1 or S2).
Cut out the opening for the water outlet.
Use a Ø 80 mm circular drill for this task.
Slide in reinforcement profile V642 (optional).
Installation of U-bracket UT 98
Ø 80
50 / 55
85
G
GD1
G
S1/S2
Y10
V642
2,5
2,5
50
UT98
ZSB (4x)
2,5
2,5
UT10
ZSB (4x)
55
4
4
PU
ZSB (3x)
Installation of U-bracket UT 100
(not possible with the water outlet)
Installation of U-bracket PU
Содержание Climax 36178
Страница 1: ...CANOPY Climax Installation instructions Self supporting aluminium profile system EN Art N 36178...
Страница 85: ...20 11 2020 85 88 E_MH_Installation_instructions_Skylux_Climax...
Страница 86: ...E_MH_Installation_instructions_Skylux_Climax 20 11 2020 86 88...
Страница 87: ...20 11 2020 87 88 E_MH_Installation_instructions_Skylux_Climax...