20/11/2020
65/88
E_MH_Installation_instructions_Skylux_Climax
Finish
WALL PROFILE
Position seal C12 to increase the pressure of C1CX on the glazing.
GUTTER
Install the end panels and click the plastic plug in the
corresponding holes. Install the thermal break GAP
between the gutter rafter and the end panel. Apply a
silicone sealant to the interior of the end panel.
A frontal UGS water outlet is required to ensure the
water can flow outside when the water drainage is
obstructed if the gutter has a wall on both sides. Drill
an opening with a Ø of at least 33 and no more than 35
mm at the front of the gutter. This opening should be
lower than the overflow in the gutter end panels.
MT
C12
C1CX
UGS
ZSG
GAP
Содержание Climax 36178
Страница 1: ...CANOPY Climax Installation instructions Self supporting aluminium profile system EN Art N 36178...
Страница 85: ...20 11 2020 85 88 E_MH_Installation_instructions_Skylux_Climax...
Страница 86: ...E_MH_Installation_instructions_Skylux_Climax 20 11 2020 86 88...
Страница 87: ...20 11 2020 87 88 E_MH_Installation_instructions_Skylux_Climax...