E_MH_Installation_instructions_Skylux_Climax
20/11/2020
48/88
Gutter
Multiple gutter elements can be connected to each other for gutter lengths > 7 metres. A gutter support must be
installed at every gutter connection point. We recommend tilting the profiles and supporting the gutter support
connections when using a gutter and gutter support (GD1.GD2) combination.
The gutter profiles can be linked using connection pins (909) and/or GI connector profile. Use silicone glue SG20
as sealant.
Install the outlet in the gutter opening and seal using
silicone.
The gutter slide ends have to be pre-installed using
self-drilling ZGS screws if the gutter is installed
between two walls (for example with a gutter
bracket).
G + GI + SG20 + 909 (3x)
G + 909 (3x)
909
909
909
SG20
SG20
G
GI
GC
20
40
ZSG (4x)
GDC
Place the preassembled gutter on the posts and
fasten the structure using coated ZSG screws.
A raised profile GR can be installed on the G
gutter. First, position the side gutter slide ends
and, next, fasten the GR profile on to the gutter
every 500 mm.
500
GR
Содержание Climax 36178
Страница 1: ...CANOPY Climax Installation instructions Self supporting aluminium profile system EN Art N 36178...
Страница 85: ...20 11 2020 85 88 E_MH_Installation_instructions_Skylux_Climax...
Страница 86: ...E_MH_Installation_instructions_Skylux_Climax 20 11 2020 86 88...
Страница 87: ...20 11 2020 87 88 E_MH_Installation_instructions_Skylux_Climax...