Protection
IMx-M Manager
2 - 66
SKF Multilog On-Line System IMx-M
User Manual
Launching the Application
When the application is initially launched the user has the option to either create a new
master project file (known as a project) or to edit an existing one.
Creating a New Project
Select
Create New Project
, enter appropriate values into each of the enabled text fields
and press the
OK
button.
Figure 2 - 36.
Creating a New Project.
Remember when creating a new project that the name chosen should represent the
plant level of the system, and not a specific area or rack, as these will be added as the
project hierarchy.
Project Administration Password
must be a string of characters that is minimum 6
characters long (ASCII). It will be required to save any changes to the existing project.