Instruction Manual OilGuard 2 Ex
Commissioning
42
13003E/3
WORKSTEP
ADDITIONAL INFO / IMAGES
10. Establish the service voltage to the system.
11. 11.1: Set the purging air to 1.5 bar on the pres-
sure reducing valve (Figure 7, pos. 10). The purg-
ing process begins. After the purging process is
completed, the instrument is switched on as fol-
lows:
11.2: The welcome screen appears.
The factory setting language is English. Ac-
cordingly, the displayed language during the ini-
tial start-up is English.
11.3: The instrument carries out an internal func-
tional check.
11.3: The instrument is ready for measurement.
12. Set the operating language.
Section 8.1
13. Set the current outputs.
Section 8.2
14. Set the limits.
Section 8.3
15. Set the inputs.
Section 8.5
16. Set the outputs.
Section 8.4
17. Set the date and time.
Section 8.6
18. Enter the access code.
Section 8.7
19. Copy the configured data to the microSD card.
Section 8.8
Содержание OilGuard 2 Ex
Страница 6: ...Instruction Manual OilGuard 2 Ex Contents 6 13003E 3 This page is intentionally blank Makro...
Страница 101: ...Spare parts list Instruction Manual OilGuard 2 Ex 13003E 3 101 This page is intentionally blank...
Страница 103: ...Appendix Instruction Manual OilGuard 2 Ex 13003E 3 103 This page is intentionally blank...