Communication Using Function Blocks
6-17
Point-to-point connection CP 440 Installation and Parameter Assignment
A5E00057742-02
Time Sequence Chart for the RES_RECV FB
The figure below illustrates the behavior of the DONE and ERROR parameters,
depending on how the REQ and R inputs are wired.
Delete receive buf
fer
Completion without errors
RESET
transmitted
Completion with errors
RESET
transmitted
Completion without errors
Job
not executed
REQ
R
DONE
ERROR
Figure 6-3
Time Sequence Chart for the 11 RES_RECV FB
Note
The REQ input is edge-triggered. A positive edge at the REQ input is sufficient. It
is not necessary for the RLO (result of logical operation) to be at “1” during the
whole transmission.
Содержание SIMATIC CP 440
Страница 10: ...Contents x Point to point connection CP 440 Installation and Parameter Assignment A5E00057742 02 ...
Страница 134: ...Diagnostics with the CP 440 8 16 Point to point connection CP 440 Installation and Parameter Assignment A5E00057742 02 ...
Страница 164: ...Accessories and Order Numbers D 2 Point to point connection CP 440 Installation and Parameter Assignment A5E00057742 02 ...