Installing the CP 440
4-4
Point-to-point connection CP 440 Installation and Parameter Assignment
A5E00057742-02
4.3
Installation Guidelines
To be Observed
The general installation guidelines for the S7-400 must be observed (see the
S7-400/M7-400 Programmable Controllers, Hardware and Installation manual).
To meet the EMC (electromagnetic compatibility) values, the cable shield must be
connected to a shield bus.
Содержание SIMATIC CP 440
Страница 10: ...Contents x Point to point connection CP 440 Installation and Parameter Assignment A5E00057742 02 ...
Страница 134: ...Diagnostics with the CP 440 8 16 Point to point connection CP 440 Installation and Parameter Assignment A5E00057742 02 ...
Страница 164: ...Accessories and Order Numbers D 2 Point to point connection CP 440 Installation and Parameter Assignment A5E00057742 02 ...