ET 200L, ET 200L-SC and ET 200L-SC IM-SC Distributed I/O Device
EWA 4NEB 780 6009-02c
2.1
Installing the ET 200L TB 16L/TB 32L Terminal Block and
Supplementary Terminal
In this section, we describe how you install the terminal block and the sup-
plementary terminal.
Install the terminal block on a rail.
You install the ET 200L distributed I/O device on a rail conforming with
EN 50022 (35
7.5 or 35
15).
The preferred mounting position is horizontal installation on a vertical
wall. All other mounting positions are conceivable.
You require a free space on a rail of 145 mm (16 channels) or 191 mm
(32 channels).
The minimum installation depth is 82 mm (with an electronics block
installed and an MLFB 6ES7 972-0CA30 0XA0 bus connector connected)
when using a 35
7,5 mm rail.
You require a free space of 35 mm above the terminal block. You require
a free space of 20 mm below the terminal block(when using the 42 mm
single-tier supplementary terminal or the 57 mm two-tier supplementary
terminal).
If you add a TB 16SC to the ET 200L, you need a free space of 40 mm
instead of 35 mm above the terminal block.
Introduction
Requirements
Installation
Содержание Metro 21 M216KA
Страница 18: ...xviii ET 200L ET 200L SC and ET 200L SC IM SC Distributed I O Device EWA 4NEB 780 6009 02c Contents ...
Страница 34: ...1 16 ET 200L ET 200L SC and ET 200L SC IM SC Distributed I O Device EWA 4NEB 780 6009 02c Product Overview ...
Страница 56: ...2 22 ET 200L ET 200L SC and ET 200L SC IM SC Distributed I O Device EWA 4NEB 780 6009 02c Installation ...
Страница 86: ...4 6 ET 200L ET 200L SC and ET 200L SC IM SC Distributed I O Device EWA 4NEB 780 6009 02c Commissioning ...
Страница 102: ...5 16 ET 200L ET 200L SC and ET 200L SC IM SC Distributed I O Device EWA 4NEB 780 6009 02c Diagnostics g ...
Страница 112: ...6 10 ET 200L ET 200L SC and ET 200L SC IM SC Distributed I O Device EWA 4NEB 780 6009 02c General Technical Data ...