Shock Wave System
3 - 5
Siemens AG
RXL2-120.815.01
Page 5 of 6
LITHOSTAR Multiline
Medical Solutions
Rev. 02
02.05
CS PS 24
System manual
•
Check if the water level is still OK, after the coupling bellows has completely collapsed
(1/Fig. 2).
Remove or replenish small amounts of water using a syringe via the coupling bellows
valve.
•
Connect the measurement device at measurement point X3.4 on board W12 (0 V on
board D1 at measurement point X3).
•
Check whether 1.0V ± 10mV are present. Adjust it as necessary with R998 on board
W12. If the W4 (B3) sensor cannot be adjusted to 1.0 V ± 10 mV, the zero point offset
recorded exceeds the tolerance. In this case, the W4 (B3) sensor must be replaced
(refer to shock wave system repair instructions RXL2-120.091.06...).
•
Reset switches S2 and S3 on board W12 to the STANDARD MODE position (Fig. 1).
Shockwave Release Function
3
•
Switch the system
OFF
.
•
Remove the left cover from the shock wave generator.
•
Record the start-up data on the label inside the cover.
•
Reattach the cover.
•
Switch the system
ON
.
•
Check the switch positions on the high voltage charger; the following positions must be
selected:
•
Selectable:
- Establish the coupling pressure (refer to Operating PC monitor).
or
- Set the S3 switch (W12 board) to service mode (Fig.1).
•
Starting from step 0.1 (default position), increase the shock wave energy in steps up to
step 9 and release several shots at each step.
•
Set the S3 switch back to the STANDARD MODE position.
During operation, the measured value may change by
±
100 mV.
Reason:
The coupling bellows neutral position cannot be exactly repro-
duced.
If there are deviations, proceed according to the shock wave sys-
tem repair instructions RXL2-120.091.06...
SPANNUNG:
ISTWERT
BETRIEB: FERN
AUSGANG: EIN
NETZ: EIN
There must be some gel on the coupling bellows (this ensures
longer life of the coupling bellows).
NOTE
NOTE