![SEA STK3-GMV10 Скачать руководство пользователя страница 29](http://html.mh-extra.com/html/sea/stk3-gmv10/stk3-gmv10_manual-for-installation-and-use_1220677029.webp)
SEA SYSTEMS
INSTALLATION AND USE
STK3-GMV10 Control panel and Pre-wiring
For Hydraulic Elevators
MSTK3-GB
Rev.04
05/02/12
© Sea Systems S.r.l.
Page 29 of 81
B.9) Connections to Panel and Power-on
1. Disconnect the Use-Installation button panel of the control panel.
2. Connect the flexible cables and the shaft lifting cable to the control panel according to
the installation schematic diagrams.
3. Connect the traction power line (L1, L2, L3), the pump motor (MC), the solenoid valves
(YD, YL, YP, YE), and the temperature and pressure sensors (RT, STO, SPO1, SPO2,
SPO4) to the control panel as shown in the installation schematic diagram.
NOTE
The items called out in point 3 should have already been connected during the
pre-installation phase as indicated in Paragraph 2.6 - Connections for Pre-
Installation Operations.
4. Turn on the panel and verify that the following LED turn on:
H1, H2, H2E, H7, H8, H10, H+24E, POWER;
5. Select the NORMAL type of operation using the PT01 keyboard (parameter 4.1).
6. Search and eliminate any eventual problems (see menu
1. Diagnostics
).