![SEA STK3-GMV10 Скачать руководство пользователя страница 16](http://html.mh-extra.com/html/sea/stk3-gmv10/stk3-gmv10_manual-for-installation-and-use_1220677016.webp)
SEA SYSTEMS
INSTALLATION AND USE
STK3-GMV10 Control panel and Pre-wiring
For Hydraulic Elevators
MSTK3-GB
Rev.04
05/02/12
© Sea Systems S.r.l.
Page 16 of 81
Fig. 6 – Sequence of operations for series connections to shaft line
Open 3 pole female connector
sectioning blade
Sectioned L1 (phase) cable positioned in contact without pealing
Ground cable in contact without pealing
Position the lower and upper parts of the connector…
… and tighten using a wrench
Assembly of a male connector with a female connector
Press the conductors between the rip-resistant clamps