2.
Connect the impulse generators as shown in the installation schematic drawings.
3.
Set the operation mode to normal using menu 4.1.1
Service\Operation\Mode
.1 Mode..
Normal
4.
Commutate the shunt of the Inspection button panel on the roof of the cab to the
maintenance mode.
5.
Position the pair of magnets for the SRD and SRS timing devices according to the schematic
diagram Dia. 2.8.4.2 at the distances from the end floors indicated in table Tab. 2.8.4.1
shown below.
6.
Position the magnetic strips correctly straddling each floor as shown in the schematic
diagram Dia. 2.8.4.2 (the diagram refers to a shaft with normal story heights, or >= 30 cm)
NOTE
It is necessary that they are positioned correctly, straddling the floor.
Errors of a few cm can be corrected by manual adjustments, however the reduce
the door open detection area in one of the two operation directions.
NOTE:Reduced Storey Height
Of the distance between two adjacent floors is < 30 cm, the storey height is
considered 'reduced'.
In this case, it the magnetic strips between the two floors must be continuous,
and menu 3.3.1
Set-up\Shaft Info\Distance Type
must be set to
Reduced
.