
SECTION 2: INSTALLATION
Page 2-16
XL400/410e Operator’s Manual
2.10 LOADING THE RIBBON (CONT’D)
Place the ribbon on the Ribbon Unwind Shaft, making sure the ribbon
unwind direction is as shown). Place an empty ribbon core one the
Ribbon Rewind Shaft.
RIBBON
RIBBON UNWIND
Route the ribbon as shown. Tape the end to the ribbon core on the
Ribbon Rewind Shaft. Rotate the shaft in a clockwise direction until
several layers of ribbon are wound on the core.
RIBBON REWIND
RIBBON
RIBBON CORE
TAPE
Содержание XL 410e
Страница 1: ...XL400e 410e OPERATOR S MANUAL...
Страница 12: ...Section 1 Introduction Page 1 8 XL400 410e Operator s Manual This page has been left blank intentionally...
Страница 23: ...Section 2 Installation XL400 410e Operator s Manual Page 2 11 2 8 SENSOR POSITIONS...
Страница 56: ...Section 3 Configuration Page 3 22 XL400 410e Operator s Manual This page has been left blank intentionally...