5
- 5
5
Test Run and Others
2. Test Run
2-1. Preparing for Test Run
G
Before attempting to start the air conditioner,
check the following.
(1) All loose matter is removed from the cabinet,
especially steel filings, bits of wire, and clips.
(2) The control wiring is correctly connected and all
electrical connections are tight.
(3) The transportation pads for the indoor fan have
been removed. If not, remove them now.
(4) The power has been connected to the unit for at
least 5 hours before starting the compressor. The
bottom of the compressor should be warm to the
touch and the crankcase heater around the feet of
the compressor should be hot to the touch.
(Fig. 5-7)
(5) Both the gas and liquid tube service valves are
open. If not, open them now. (Fig. 5-8)
(6) Request that the customer be present for the trial
run.
Explain the contents of the instruction manual, then
have the customer actually operate the system.
(7) Be sure to give the instruction manual and
warranty certificate to the customer.
(8) When replacing the control PCB, be sure to make
all the same settings on the new PCB as were in
use before replacement.
The existing EEP ROM is not changed, and is
connected to the new control PCB.
Fig. 5-7
Fig. 5-8
Power mains switch
(Power must be turned ON
at least 5 hours before
attempting test run)
ON
Liquid tube service cap
Gas tube service cap
06-405 Mini-ECOi_TD5 11/6/06 5:01 PM Page 5
Содержание SPW-CR365GX56
Страница 5: ...1 1 1 Outline of Mini ECO i SYSTEM Contents 1 OUTLINE OF MINI ECO i SYSTEM 1 Line up 1 2 ...
Страница 8: ...1 4 MEMO ...
Страница 322: ...4 180 MEMO ...
Страница 330: ...CN33 S003 CN51 CN50 D043 LED2 D042 LED1 S002 S004 5 8 Test Run and Others 2 Test Run Fig 5 10 2 for SPW CR GX H 8 5 ...
Страница 344: ...5 22 MEMO ...
Страница 345: ...200611M DC ...