3
3
- 76
Control of Mini ECO-i SYSTEM
5. Schedule Timer
I
Schedule Timer and Air Conditioner Operation
Air conditioners operate either according to operations programmed from the schedule timer (starting/stopping and
remote control operation enable/disable) or according to a connected remote controller or system controller.
Schedule timer settings (Example)
Operation without system controller operation
•
•
•
If remote controller operation is enabled, the air conditioner can be started/stopped from the remote controller.
(The air conditioner responds to the most recently pressed button.)
*1 Whether remote controller operation is enabled or disabled depends on the setting of
the previous day.
*2 Since remote controller operation is disabled, operation remains disabled.
*3 The remote controller remains disabled the next day and thereafter until it is enabled in
the remote controller operation enable/disable setting.
Operation with system controller operation
If remote controller operation is enabled, the air conditioner can be started/stopped from the remote controller.
(The air conditioner responds to the most recently pressed button.)
The
remote
controller
operation enable/disable set from the system controller (Centralized control 1 to 4) is
canceled according to programmed operations.
*1 Whether remote controller operation is enabled or disabled depends on the setting of
the previous day.
*1
*2
8:00
12:00
17:00
20:00
13:00
18:00
Air conditioner
operation
Stopped
Stopped
Running
Running
Remote controller
operation
Enabled
Enabled
Disabled
Disabled
*3
*1
8:00
12:00
17:00
20:00
13:00
18:00
Air conditioner
operation
Stopped
Stopped
Stopped
Running
Running
Remote controller
operation
Enabled
Enabled
Enabled
Disabled
Operation from the system controller
[Stop + RC operation disable]
[Stop + RC operation enable]
Stopped
Disabled
Disabled
06-405 Mini-ECOi_TD3 11/6/06 6:18 PM Page 76
Содержание SPW-CR365GX56
Страница 5: ...1 1 1 Outline of Mini ECO i SYSTEM Contents 1 OUTLINE OF MINI ECO i SYSTEM 1 Line up 1 2 ...
Страница 8: ...1 4 MEMO ...
Страница 322: ...4 180 MEMO ...
Страница 330: ...CN33 S003 CN51 CN50 D043 LED2 D042 LED1 S002 S004 5 8 Test Run and Others 2 Test Run Fig 5 10 2 for SPW CR GX H 8 5 ...
Страница 344: ...5 22 MEMO ...
Страница 345: ...200611M DC ...