3
3
- 54
Control of Mini ECO-i SYSTEM
4. System Controller
I
How to Perform Zone Registration
To operate the system controller properly, zone registration is required after
finishing the test run (and after setting all indoor unit addresses) using one of
the following methods.
(a) Zone registration using the remote controller (RCS-SH80AG)
Refer to page
(b) Zone registration using the system controller (SHA-KC64AG)
Refer to page
(c) Automatic zone registration using the system controller (SHA-KC64AG)
Refer to page
For methods (a) and (b), you should make a zone registration table manually
before performing the registration. Use the form on page 3-56 for this.
For method (c), zone registration is executed automatically, proceeding from
small indoor unit addresses and small central addresses to larger numbers in
numerical order. For example:
Central
1
2
3
4
5
6
ZONE-group
1-1
1-2
1-3
1-4
1-5
1-6
Indoor unit address
1-1
1-2
2-1
2-2
2-3
3-1
1.
An indoor unit address is assigned to each indoor unit during automatic
address operation. Each indoor unit address combines an R.C. address
and indoor unit number as follows:
: Indoor unit address (UNIT No.)
Indoor unit No.
Refrigerant circuit No. (R.C. address)
This address is displayed on remote controller for UNIT No. when the UNIT
button is pressed.
2.
The central address represents the zone and group number. These
addressed are assigned in ascending numerical order.
NOTE
1 1
3-55
3-56
3-56
address
06-405 Mini-ECOi_TD3 11/6/06 6:18 PM Page 54
Содержание SPW-CR365GX56
Страница 5: ...1 1 1 Outline of Mini ECO i SYSTEM Contents 1 OUTLINE OF MINI ECO i SYSTEM 1 Line up 1 2 ...
Страница 8: ...1 4 MEMO ...
Страница 322: ...4 180 MEMO ...
Страница 330: ...CN33 S003 CN51 CN50 D043 LED2 D042 LED1 S002 S004 5 8 Test Run and Others 2 Test Run Fig 5 10 2 for SPW CR GX H 8 5 ...
Страница 344: ...5 22 MEMO ...
Страница 345: ...200611M DC ...