Machine Operation
SY26U Excavator OMM
4-48
Operation and Maintenance Manual — 1119
SANY
TRANSPORTATION INFORMATION
Transportation Method
Applicable laws and regulations must be observed when transporting the machine.
•
When transporting the machine with a trailer, confirm the length, width, height, and weight capacity of the
trailer before loading.
•
Investigate road conditions in advance (for example, dimension restrictions, weight restrictions, and traffic
regulations).
•
The machine may need to be disassembled to meet the local dimension and/or weight limits.
NOTE:
The machine’s shipping weight and dimensions may vary, depending on its tracks and work
equipment.
Loading and Unloading
•
Push the throttle control lever forward (low idle). Operating the engine at high idle could result in sudden,
unexpected movement.
•
Use level, solid ground and keep the machine a safe distance away from roads during loading and unloading
operations.
WARNING!
•
To prevent the machine from tipping over, select a firm and level location that is a safe
distance from any road or structure.
•
Make sure the trailer is properly chocked to prevent any movement.
•
Use an access ramp with enough length, strength, and width to properly support the
machine. The ramp grade should not exceed 15°.
•
Drive slowly at the junction of the ramp and the trailer. The machine may shift suddenly due
to a change in its center of gravity.
•
Use a signalman to alert the operator to any potential hazards.
Failure to follow these precautions could result in death or injury.