SY26U Excavator OMM
Maintenance
SANY
Operation and Maintenance Manual — 1119
5-49
T
ABL
E OF
CONT
E
N
TS
INTRODUCTION
SAFE
T
Y
MACHIN
E
CONTROLS
MACHINE
OP
ERA
T
IO
N
MA
INTENANCE
SPEC
IFI
CA
TIO
N
S
OP
T
IO
N
A
L
EQUI
PMENT
Arm Cylinder Base End Pin
1. Remove the grease fitting cap (1) from the arm cylin-
der base end pin grease fitting (2).
2. Grease the arm cylinder base end pin grease fitting.
NOTE:
Wipe excess grease from around the grease
fitting.
3. Install the grease fitting cap.
Boom Cylinder Rod End Pin
1. Remove the grease fitting cap (1) from the boom cylin-
der rod end pin grease fitting (2).
2. Grease the boom cylinder rod end pin grease fitting.
NOTE:
Wipe excess grease from around the grease
fitting.
3. Install the grease fitting cap.
Boom Cylinder Base End Pin
1. Remove the grease fitting cap (1) from the boom cylin-
der base end pin grease fitting (2).
2. Grease the boom cylinder base end pin grease fitting.
NOTE:
Wipe excess grease from around the grease
fitting.
3. Install the grease fitting cap.
Fig. 5-39
0003242
1
2
Fig. 5-40
0003243
1
2
Fig. 5-41
0003244
1
2