SY26U Excavator OMM
Maintenance
SANY
Operation and Maintenance Manual — 1119
5-51
T
ABL
E OF
CONT
E
N
TS
INTRODUCTION
SAFE
T
Y
MACHIN
E
CONTROLS
MACHINE
OP
ERA
T
IO
N
MA
INTENANCE
SPEC
IFI
CA
TIO
N
S
OP
T
IO
N
A
L
EQUI
PMENT
Dozer Blade Cylinder End and Blade Linkage Pins
NOTE:
Only one dozer blade linkage pin grease
fitting cap is shown.
1. Remove the grease fitting caps (1) from the dozer
blade cylinder end pins (2) and the dozer blade linkage
pins. (3)
2. Grease the dozer blade cylinder end pins and the dozer
blade linkage pins grease fittings.
NOTE:
Wipe excess grease from around the grease
fittings.
3. Install the grease fitting caps.
Bucket Linkage Pins
1. Remove the grease fitting caps (2) from the bucket
linkage pin grease fittings (1).
2. Grease the bucket linkage pin grease fittings.
NOTE:
Wipe excess grease from around the grease
fittings.
Install the grease fitting caps.
Bucket Cylinder Rod End Pin
1. Remove the grease fitting caps (1) from the bucket cyl-
inder rod end pin grease fittings (2).
2. Grease the bucket cylinder rod end pin grease fittings.
NOTE:
Wipe excess grease from around the grease
fittings.
3. Install the grease fitting caps.
Fig. 5-44
0003245
1
3
2
1
Fig. 5-45
0001677
2
2
1
Fig. 5-46
0003179
1
1
2
2