SY26U Excavator OMM
Machine Operation
SANY
Operation and Maintenance Manual — 1119
4-43
T
ABL
E OF
CONT
E
N
TS
INTRODUCTION
SAFE
T
Y
MACHIN
E
CONTROLS
MACHINE
OP
ERA
T
IO
N
MA
INTENANCE
SPEC
IFI
CA
TIO
N
S
OP
T
IO
N
A
L
EQUI
PMENT
PARK THE MACHINE
1. Move the machine to a solid, level surface.
2. Lower the bucket and dozer blade to the ground.
3. Push the throttle control lever forward (low idle). Run
the engine at idle for 5 minutes to cool it down.
4. Move the hydraulic lockout control lever to the locked
(closed) position.
5. Turn the key switch to OFF and remove the key.
6. Turn the battery disconnect switch to OFF.
Parking the Machine on a Grade
If it is necessary to park the machine on a grade:
1. Firmly set the bucket teeth and dozer blade into the
ground.
2. Move the hydraulic lockout control lever to the locked
(closed) position.
3. Turn the key switch to OFF and remove the key.
4. Turn the battery disconnect switch to OFF.
5. Securely chock the tracks.
CAUTION!
Avoid parking the machine on a grade when possible. Machine rollover can cause injury.
Fig. 4-62
0002525
Fig. 4-63
0002927