LED R&D Lab(VD)
99
9. Position the ASSY FRAME BEZEL TOP BOTTOM on the upper right of the cabinet.
* Using one M4, L8 screw, connect the frame bezel top bottom and the top hole of the cabinet
(2 places).
* If gap correction is required, remove the gap sheet and adjust the separation distance.
GAP SHEET
Bezel Top
Cabinet
Gap sheet
GAP
remove
Bezel Bottom
Gap sheet
GAP
remove
M4,L8
7. Frame Bezel installation
◇
Bezel installation
Содержание IFA Series
Страница 1: ...LED R D Lab VD LED Display Installation Manual IWA IFA Series LH0 IWA W LH0 IFA VS Ver 3 3 ...
Страница 54: ...LED R D Lab VD 53 4 Frame installation Precautions for Fastening the Screws ...
Страница 130: ...LED R D Lab VD 129 8 S Box Installation and Connection S Box Grouping Support Frequency 1 2 ...
Страница 131: ...LED R D Lab VD 130 8 S Box Installation and Connection S Box Grouping Support Frequency 2 2 ...
Страница 200: ...Thank you ...
Страница 213: ...LED R D Lab VD 212 Accessories configuration SNOW JMU Appendix 3 S BOX Accessory List ...
Страница 219: ...LED R D Lab VD 218 Supported resolution list Appendix 5 AAE S Box How to set Multiview function ...