LED R&D Lab(VD)
31
□
Guide for docking connection error (Mechanical)
▶
Check Cabinet status.
-
Additional insertion is carried out by applying a load on the bracket-frame to prevent cabinet not inserted.
※ When applying the load, apply the load only to BRACKET
-FRAME so that there is no damage to the LED module.
▶
Check Docking connection status
①
Check the status after pressing Docking in the up-down direction. (Fig1. )
②
Remove the four screws for docking and press them again in the up-down direction.
→
After checking the status, fasten the four screws and fix the docking. (Fig2. )
→
If a connection error occurs again after fastening four screws,
remove two screws for the upper dock (bottom of the cabinet standard)
and press them in the up-down direction to check the connection status. (Fig3. )
LED Module
BRACKET-FRAME
1. Product Information and Installation Precautions
Upper Docking
Lower Docking
Screw
Screw
Remove
Fastening
the Screw
Screw
Remove
Fig1. Up-Down direction
Fig2. Up-Down dir Screw rework
Fig3. Remove two screws.
Screw
Содержание IFA Series
Страница 1: ...LED R D Lab VD LED Display Installation Manual IWA IFA Series LH0 IWA W LH0 IFA VS Ver 3 3 ...
Страница 54: ...LED R D Lab VD 53 4 Frame installation Precautions for Fastening the Screws ...
Страница 130: ...LED R D Lab VD 129 8 S Box Installation and Connection S Box Grouping Support Frequency 1 2 ...
Страница 131: ...LED R D Lab VD 130 8 S Box Installation and Connection S Box Grouping Support Frequency 2 2 ...
Страница 200: ...Thank you ...
Страница 213: ...LED R D Lab VD 212 Accessories configuration SNOW JMU Appendix 3 S BOX Accessory List ...
Страница 219: ...LED R D Lab VD 218 Supported resolution list Appendix 5 AAE S Box How to set Multiview function ...