![Samsung IFA Series Скачать руководство пользователя страница 106](http://html.mh-extra.com/html/samsung/ifa-series/ifa-series_installation-manual_350856106.webp)
LED R&D Lab(VD)
105
• Vertical extension (in case of 8X8 extension)
1. Attach
EXTENDED SHEET
to FRAME BEZEL TOP
①
TOP Attached to the inner upper part guide (red dotted line)
②
After attaching from the end to the end of the TOP, cut the remaining part for use.
*
EXTENDED SHEET
사양
(W3.5, L806, T2.0)
*
If there is no GAP, connect without attaching the SHEET
2. Attach
GAP SHEET(T2.5)
to FRAME BEZEL TOP
①
Attached according to the inner hole of the TOP
②
Attached by Center-Center
*GAP SHEET Specification (RUBBER, W9, L17.9, T2.5 + double
-sided tape)
◇
Bezel Extension Installation
7. Frame Bezel installation
Содержание IFA Series
Страница 1: ...LED R D Lab VD LED Display Installation Manual IWA IFA Series LH0 IWA W LH0 IFA VS Ver 3 3 ...
Страница 54: ...LED R D Lab VD 53 4 Frame installation Precautions for Fastening the Screws ...
Страница 130: ...LED R D Lab VD 129 8 S Box Installation and Connection S Box Grouping Support Frequency 1 2 ...
Страница 131: ...LED R D Lab VD 130 8 S Box Installation and Connection S Box Grouping Support Frequency 2 2 ...
Страница 200: ...Thank you ...
Страница 213: ...LED R D Lab VD 212 Accessories configuration SNOW JMU Appendix 3 S BOX Accessory List ...
Страница 219: ...LED R D Lab VD 218 Supported resolution list Appendix 5 AAE S Box How to set Multiview function ...