LED R&D Lab(VD)
179
10. Settings / How to Use
1.
Home screen
:
Shows information about connected devices, the input source, the cabinet configuration, and devices with errors.
[
★
Caution!] For internal communication between the S-Box and LED cabinets,
use ports 1515, 48484, 48485 and 58585
When firewalls / security network are in use, make sure the corresponding port
between the S-Box and LED cabinets is enabled.
10-1. Control Program for PC
Содержание IFA Series
Страница 1: ...LED R D Lab VD LED Display Installation Manual IWA IFA Series LH0 IWA W LH0 IFA VS Ver 3 3 ...
Страница 54: ...LED R D Lab VD 53 4 Frame installation Precautions for Fastening the Screws ...
Страница 130: ...LED R D Lab VD 129 8 S Box Installation and Connection S Box Grouping Support Frequency 1 2 ...
Страница 131: ...LED R D Lab VD 130 8 S Box Installation and Connection S Box Grouping Support Frequency 2 2 ...
Страница 200: ...Thank you ...
Страница 213: ...LED R D Lab VD 212 Accessories configuration SNOW JMU Appendix 3 S BOX Accessory List ...
Страница 219: ...LED R D Lab VD 218 Supported resolution list Appendix 5 AAE S Box How to set Multiview function ...