LED R&D Lab(VD)
68
- Cabling guide (BRIDGE-BOX-I/G, C-TYPE connection)
1. Connect C TYPE CABLE to BRIDGE BOX.
2. Fix C TYPE CABLE by attaching 1 HOLDER CABLE inside the yellow line (end).
3. After connecting C TYPE CABLE to I/G, arrange it using the shape of a hanger.
2
1
3
※ S
-BOX Connection IG / Bridge Box Specification
(SNOWAAE, External IR/ECO & BT/WIFI )
5. C Frame installation
Содержание IFA Series
Страница 1: ...LED R D Lab VD LED Display Installation Manual IWA IFA Series LH0 IWA W LH0 IFA VS Ver 3 3 ...
Страница 54: ...LED R D Lab VD 53 4 Frame installation Precautions for Fastening the Screws ...
Страница 130: ...LED R D Lab VD 129 8 S Box Installation and Connection S Box Grouping Support Frequency 1 2 ...
Страница 131: ...LED R D Lab VD 130 8 S Box Installation and Connection S Box Grouping Support Frequency 2 2 ...
Страница 200: ...Thank you ...
Страница 213: ...LED R D Lab VD 212 Accessories configuration SNOW JMU Appendix 3 S BOX Accessory List ...
Страница 219: ...LED R D Lab VD 218 Supported resolution list Appendix 5 AAE S Box How to set Multiview function ...