![Samsung IFA Series Скачать руководство пользователя страница 36](http://html.mh-extra.com/html/samsung/ifa-series/ifa-series_installation-manual_350856036.webp)
LED R&D Lab(VD)
35
2. Preparation for Cabinet Installation
◆
Preparations before installation
①
Remove the Box tape at the upper area and then open up the box.
(Fig.2)
②
Remove the Top-cushion and bag shielding. Grab the handle inside, take out the cabinet and open Al-Bag.
Then remove the filament-tape and PAD-EPE.
③
Check if the Sliding Bolts are fixed well.
(Fig.3)
Fig.1 Packing
Component
Fig. 2 Opening of Box
Fig.3 Check the Bolt
Al-Bag
Open Bag Zipper
SLIDING BOLT
LED set
Box
Top-Cushion
Bottom-Cushion
Accessory
Содержание IFA Series
Страница 1: ...LED R D Lab VD LED Display Installation Manual IWA IFA Series LH0 IWA W LH0 IFA VS Ver 3 3 ...
Страница 54: ...LED R D Lab VD 53 4 Frame installation Precautions for Fastening the Screws ...
Страница 130: ...LED R D Lab VD 129 8 S Box Installation and Connection S Box Grouping Support Frequency 1 2 ...
Страница 131: ...LED R D Lab VD 130 8 S Box Installation and Connection S Box Grouping Support Frequency 2 2 ...
Страница 200: ...Thank you ...
Страница 213: ...LED R D Lab VD 212 Accessories configuration SNOW JMU Appendix 3 S BOX Accessory List ...
Страница 219: ...LED R D Lab VD 218 Supported resolution list Appendix 5 AAE S Box How to set Multiview function ...