![Samsung IFA Series Скачать руководство пользователя страница 108](http://html.mh-extra.com/html/samsung/ifa-series/ifa-series_installation-manual_350856108.webp)
LED R&D Lab(VD)
107
16. Place the ASSY FRAME BEZEL TOP on the upper left of the cabinet.
* Using one M4, L8 screw, fasten the FRAME BEZEL TOP and the top hole of the cabinet (2 places)
* If gap correction is necessary, add a gap sheet to adjust the separation distance.
◇
Bezel Installation
GAP SHEET
M4,L8
Bezel Top
Cabinet
Gap sheet
GAP
ADD
Bezel Bottom
Gap sheet
GAP
REMOVE
7. Frame Bezel installation
Содержание IFA Series
Страница 1: ...LED R D Lab VD LED Display Installation Manual IWA IFA Series LH0 IWA W LH0 IFA VS Ver 3 3 ...
Страница 54: ...LED R D Lab VD 53 4 Frame installation Precautions for Fastening the Screws ...
Страница 130: ...LED R D Lab VD 129 8 S Box Installation and Connection S Box Grouping Support Frequency 1 2 ...
Страница 131: ...LED R D Lab VD 130 8 S Box Installation and Connection S Box Grouping Support Frequency 2 2 ...
Страница 200: ...Thank you ...
Страница 213: ...LED R D Lab VD 212 Accessories configuration SNOW JMU Appendix 3 S BOX Accessory List ...
Страница 219: ...LED R D Lab VD 218 Supported resolution list Appendix 5 AAE S Box How to set Multiview function ...