LED R&D Lab(VD)
66
◇
CABINET installation
(IWA P1.26)
[ UHD SCREEN (36Cabinet) ]
①
(Intall the I/G at the bottom) Before installing CABINET, connect and arrange cables to I/G and BRIDGE BOX.(Fig.1)
※ CABINET No. 1 starts at the bottom left, and I/G is placed at the top right of CABINET No. 1 (attached by magnet).
※ I/G and BRIDGE BOX are connected to each other via USB 3.0, and each sensor and S
-BOX are connected (Fig. 2).
※ In case of IFA model, BRIDGE BOX and sensor are not needed when installing with SNOWJMU.
Fig.1 I/G and B/BOX arrangement
5. C Frame installation
Fig.2 I/G, B/BOX, sensor cable connection
I/G
B/BOX
B/BOX
I/G
Illuminance sensor
Bluetooth/wifi
USB type C connection
S-BOX(Optical cable connection)
Содержание IFA Series
Страница 1: ...LED R D Lab VD LED Display Installation Manual IWA IFA Series LH0 IWA W LH0 IFA VS Ver 3 3 ...
Страница 54: ...LED R D Lab VD 53 4 Frame installation Precautions for Fastening the Screws ...
Страница 130: ...LED R D Lab VD 129 8 S Box Installation and Connection S Box Grouping Support Frequency 1 2 ...
Страница 131: ...LED R D Lab VD 130 8 S Box Installation and Connection S Box Grouping Support Frequency 2 2 ...
Страница 200: ...Thank you ...
Страница 213: ...LED R D Lab VD 212 Accessories configuration SNOW JMU Appendix 3 S BOX Accessory List ...
Страница 219: ...LED R D Lab VD 218 Supported resolution list Appendix 5 AAE S Box How to set Multiview function ...