LED R&D Lab(VD)
39
2. Preparation for Cabinet Installation
◆
Preparations before installation
⑥
After removing the cover corner, remove the 4 screws as shown in the figure.
(Fig.6)
※ Caution
: Please, Don’t forget front service can be IMPOSSIBLE, if the screw is not removed.
⑦
Assemble 2 screws provided as accessories at the top of the cabinet.
(Fig.7)
⑧
The Cover-Power of Cabinets the power cable connected in should be gone down like the picture below.
- Let Cover-Power go down to connect the power cable
※ Caution
: Lowering Cover-Power will disconnect AC power connection from lower cabinet.
Please maintain Cover-Power in closed position except to connect primary AC power cable.
Fig.6 Remove screw
Fig.8 Move Cover Power
※ SCREW 2pcs
SIDE VIEW
Fasten it until it comes out a
little more than the GUIDE line.
Fig.7 Assemble screw
※ SCREW 4pcs
※ Push the screw so that the
thread is mounted on the
tap and release it.
Содержание IFA Series
Страница 1: ...LED R D Lab VD LED Display Installation Manual IWA IFA Series LH0 IWA W LH0 IFA VS Ver 3 3 ...
Страница 54: ...LED R D Lab VD 53 4 Frame installation Precautions for Fastening the Screws ...
Страница 130: ...LED R D Lab VD 129 8 S Box Installation and Connection S Box Grouping Support Frequency 1 2 ...
Страница 131: ...LED R D Lab VD 130 8 S Box Installation and Connection S Box Grouping Support Frequency 2 2 ...
Страница 200: ...Thank you ...
Страница 213: ...LED R D Lab VD 212 Accessories configuration SNOW JMU Appendix 3 S BOX Accessory List ...
Страница 219: ...LED R D Lab VD 218 Supported resolution list Appendix 5 AAE S Box How to set Multiview function ...