LED R&D Lab(VD)
81
⑧
When installing docking, check the Z-axis step between upper and lower CABINETs.
※ If a step occurs, use an absorber to open the gap and then fix the gap using a Gap Tool (Fig. 1).
※ Adjust the SEAM using the assembled horizontal sharing surface (using the supplied 1.5mm wrench).
:
The left side controls the bottom and the right side controls the top part (Fig. 2).
※ When detaching and reinstalling the top CABINET, Return the SEAM screw to initial position to prevent deformation.(Fig.3)**
*
Fig.1 Secure Gap with upper/lower CABINET adsorber and fix with Gap Tool
Fig.2 Z-axis step adjustment
Un-Lock
Lock
Adsorber
※ After inserting it in the horizontal direction,
it is fixed by turning it vertically.
1
2
A/S-ASSY GAP TOOL
(BN81-17113A)
◇
CABINET installation
(IWA P1.26)
[ UHD SCREEN (36Cabinet) ]
5. C Frame installation
Fig.3 SEAM Screw Return
Содержание IFA Series
Страница 1: ...LED R D Lab VD LED Display Installation Manual IWA IFA Series LH0 IWA W LH0 IFA VS Ver 3 3 ...
Страница 54: ...LED R D Lab VD 53 4 Frame installation Precautions for Fastening the Screws ...
Страница 130: ...LED R D Lab VD 129 8 S Box Installation and Connection S Box Grouping Support Frequency 1 2 ...
Страница 131: ...LED R D Lab VD 130 8 S Box Installation and Connection S Box Grouping Support Frequency 2 2 ...
Страница 200: ...Thank you ...
Страница 213: ...LED R D Lab VD 212 Accessories configuration SNOW JMU Appendix 3 S BOX Accessory List ...
Страница 219: ...LED R D Lab VD 218 Supported resolution list Appendix 5 AAE S Box How to set Multiview function ...