![Samsung IFA Series Скачать руководство пользователя страница 79](http://html.mh-extra.com/html/samsung/ifa-series/ifa-series_installation-manual_350856079.webp)
LED R&D Lab(VD)
78
⑥
2,3,4,5,6 While installing the CABINET, check if there is a step in the Z axis.
※ When a step occurs, use an absorber to open the gap between the CABINETs with the step difference. (Fig.1)
※ SEAM can be adjusted using the adjustment device of the vertical bar (using the 1.5mm wrench included in the frame kit).
※ The upper part controls the right and the lower part controls the left. (Fig. 2)
Fig.1 Check the Z-axis step and move it to the front with the adsorber
LED
2
Fig.2 Z-axis step adjustment
Un-Lock
Lock
Absorber
◇
CABINET installation
(IWA P1.26)
[ UHD SCREEN (36Cabinet) ]
5. C Frame installation
Содержание IFA Series
Страница 1: ...LED R D Lab VD LED Display Installation Manual IWA IFA Series LH0 IWA W LH0 IFA VS Ver 3 3 ...
Страница 54: ...LED R D Lab VD 53 4 Frame installation Precautions for Fastening the Screws ...
Страница 130: ...LED R D Lab VD 129 8 S Box Installation and Connection S Box Grouping Support Frequency 1 2 ...
Страница 131: ...LED R D Lab VD 130 8 S Box Installation and Connection S Box Grouping Support Frequency 2 2 ...
Страница 200: ...Thank you ...
Страница 213: ...LED R D Lab VD 212 Accessories configuration SNOW JMU Appendix 3 S BOX Accessory List ...
Страница 219: ...LED R D Lab VD 218 Supported resolution list Appendix 5 AAE S Box How to set Multiview function ...