
LED R&D Lab(VD)
119
Since it is a common cause of malfunction, special attention is required when connecting the
connector.
In the case of duplex type, the locking structure is released and connected one by one like Simplex.
Before inserting the cable, be careful not to contaminate the end and wipe it with a soft cloth for
cleanliness.
S-Box (SNOW-AAE)
Cabinet
Cabinet
Cabinet
or
Duplex
Simplex
119
8. S-Box Installation and Connection
③
Cable Connection
Содержание IFA Series
Страница 1: ...LED R D Lab VD LED Display Installation Manual IWA IFA Series LH0 IWA W LH0 IFA VS Ver 3 3 ...
Страница 54: ...LED R D Lab VD 53 4 Frame installation Precautions for Fastening the Screws ...
Страница 130: ...LED R D Lab VD 129 8 S Box Installation and Connection S Box Grouping Support Frequency 1 2 ...
Страница 131: ...LED R D Lab VD 130 8 S Box Installation and Connection S Box Grouping Support Frequency 2 2 ...
Страница 200: ...Thank you ...
Страница 213: ...LED R D Lab VD 212 Accessories configuration SNOW JMU Appendix 3 S BOX Accessory List ...
Страница 219: ...LED R D Lab VD 218 Supported resolution list Appendix 5 AAE S Box How to set Multiview function ...