![Samsung IFA Series Скачать руководство пользователя страница 110](http://html.mh-extra.com/html/samsung/ifa-series/ifa-series_installation-manual_350856110.webp)
LED R&D Lab(VD)
109
18. Fasten to FRAME BEZEL TOP using two M3 and L5 screws each. (Fig.1)
* When a gap occurs in the middle of the bezel, attach a sheet bezel to prevent the gap from being seen from the front.
(According to the degree of separation, the number of SHEET BEZELs is added consecutively and supplemented.)
19. Using 6 M4, L8 screws, fasten the FRAME BEZEL TOP and the hole at the top of the cabinet. (Fig.2)
◇
Bezel Installation
M4,L8
[Fig.1]
[Fig.2]
M3,L5
Sheet Bezel
SHEET BEZEL
From the outside/top of the BEZEL
attached to the inside
7. Frame Bezel installation
Содержание IFA Series
Страница 1: ...LED R D Lab VD LED Display Installation Manual IWA IFA Series LH0 IWA W LH0 IFA VS Ver 3 3 ...
Страница 54: ...LED R D Lab VD 53 4 Frame installation Precautions for Fastening the Screws ...
Страница 130: ...LED R D Lab VD 129 8 S Box Installation and Connection S Box Grouping Support Frequency 1 2 ...
Страница 131: ...LED R D Lab VD 130 8 S Box Installation and Connection S Box Grouping Support Frequency 2 2 ...
Страница 200: ...Thank you ...
Страница 213: ...LED R D Lab VD 212 Accessories configuration SNOW JMU Appendix 3 S BOX Accessory List ...
Страница 219: ...LED R D Lab VD 218 Supported resolution list Appendix 5 AAE S Box How to set Multiview function ...