LED R&D Lab(VD)
77
5. C Frame installation
※ Large screen installation guide (8x8 or more)
- Instead of horizontal installation, which is the conventional installation method, it proceeds with a step-by-step installation method.
- After installing the first stage and leveling it, stack it up to the top based on the first cabinet.
- If you need to adjust the z-axis step while installing the cabinet from the 2nd stage, remove the cabinet installed at the bottom of the next
cabinet, adjust it, and then reinstall it.(Fig.1)
* The reason for separating the cabinet is to facilitate movement between cabinets when adjusting the step difference.
LED
LED
LED
2
4
N
N+1
N+2
General screen installation method
Fig.1 Large screen installation method
If adjustment is necessary as shown in the figure, work after removing the cabinet
조절이 필요한 포인트
Содержание IFA Series
Страница 1: ...LED R D Lab VD LED Display Installation Manual IWA IFA Series LH0 IWA W LH0 IFA VS Ver 3 3 ...
Страница 54: ...LED R D Lab VD 53 4 Frame installation Precautions for Fastening the Screws ...
Страница 130: ...LED R D Lab VD 129 8 S Box Installation and Connection S Box Grouping Support Frequency 1 2 ...
Страница 131: ...LED R D Lab VD 130 8 S Box Installation and Connection S Box Grouping Support Frequency 2 2 ...
Страница 200: ...Thank you ...
Страница 213: ...LED R D Lab VD 212 Accessories configuration SNOW JMU Appendix 3 S BOX Accessory List ...
Страница 219: ...LED R D Lab VD 218 Supported resolution list Appendix 5 AAE S Box How to set Multiview function ...