![Samsung IFA Series Скачать руководство пользователя страница 71](http://html.mh-extra.com/html/samsung/ifa-series/ifa-series_installation-manual_350856071.webp)
LED R&D Lab(VD)
70
- Cabling guide (BRIDGE-BOX – S-BOX, HDBT connection)
S-BOX(SNOWAAE)
1
2
1. Insert HDBT cable into BRIDGE BOX.
2. VERTICAL FRAME Escape shape, turn the cable to the right.
3. Arrange cables by using a fixed hanger shape.
※ S
-BOX Connection IG / Bridge Box Specification
(SNOWAAE, External IR/ECO & BT/WIFI )
5. C Frame installation
Содержание IFA Series
Страница 1: ...LED R D Lab VD LED Display Installation Manual IWA IFA Series LH0 IWA W LH0 IFA VS Ver 3 3 ...
Страница 54: ...LED R D Lab VD 53 4 Frame installation Precautions for Fastening the Screws ...
Страница 130: ...LED R D Lab VD 129 8 S Box Installation and Connection S Box Grouping Support Frequency 1 2 ...
Страница 131: ...LED R D Lab VD 130 8 S Box Installation and Connection S Box Grouping Support Frequency 2 2 ...
Страница 200: ...Thank you ...
Страница 213: ...LED R D Lab VD 212 Accessories configuration SNOW JMU Appendix 3 S BOX Accessory List ...
Страница 219: ...LED R D Lab VD 218 Supported resolution list Appendix 5 AAE S Box How to set Multiview function ...