SAMES KREMLIN
Page 7
Manual : 573.176.112
REAR PART OF THE B6 BAY
Install a suitable high pressure material hose between the fluid outlet of the supply pump and the fluid
inlet of the REGULEX® shot meter.
Install plastic Air hose (4mm x 6mm) to supply the material control valves on the REGULEX® shot meter.
Connect the REGULEX® to a compressed air supply using a filter/regulator unit.
Adjust the air pressure to 6 bar / 87 psi.
Connect the supply pump motor to the compressed air using a filter/regulator unit.
Adjust the pressure between 1 to 5 bar / 14.5 to 72.5 psi. Depending on the material type and application.
Plug in the B6 control unit (230 V).
5- START UP
SWITCHING ON
Turn ON the 'O-I' switch, depending on the installation this may be located on the side of the control unit
or located on the rear of the control unit
A green light will illuminate,
switching on the power supply.
switching on of the screen.
Input the 'O-I' switch located on the front of the control unit.
operating of the variable speed drive.