2. OPERATION
– 64 –
– 65 –
Material to be compacted
• Asphalt pavement
• Crusher run
• Cement concrete
• Sands
• Soils
• Slag
• Soft rock
• Roller compacted concrete
Layers to be compacted
• Surface course, Binder course
• Base course
• Subgrade
• Embankment
• Shoulder
• Sidewalk
2.10 After Operation
Check for the coolant temperature, engine oil pressure and fuel level.
Follow the procedures below to prevent the machine from falling into an unworkable condition
the following morning caused by muds and other extraneous matter on the drum, or frozen
drums:
1) Remove soil and water from the machine. Muds can get into the seals together with water
drops on the hydraulic cylinder piston rod. Damaged seals will result.
2) Park the machine on a hard and dry surface. If such a place is not available, cover the
ground with hard plates.
3) Low temperature will cause a significant reduction of battery efficiency. Cover batteries or
take them off the machine and store in a warm place for the following day’s operation.
There is a danger of battery fluid leaking when removing the battery from the machine, so
take care not to tilt the battery when doing so.
4) To prevent freezing, drain water from the spray system. (See water spray system on page
59)
IMPORTANT
Insufficient draining of water can cause damage to the machine.
Содержание SW880-1
Страница 4: ......
Страница 82: ...3 PERIODIC MAINTENANCE 78 3 3 Periodic Maintenance Points...
Страница 101: ...3 PERIODIC MAINTENANCE 97...
Страница 104: ...3 PERIODIC MAINTENANCE 100...
Страница 110: ......