Operation & Maintenance w/IPB
G2 Series Decontamination Water Heater
0014
Part Number: 1006375
0014-20
DHS Systems LLC
This document contains information proprietary to DHS Systems LLC and is intended solely for use by its customers. No portion of this document may be reproduced
for release to a third party without written consent of DHS Systems LLC.
REMOVE AND REPLACE POWER SWITCH PROCEDURES
PROCEDURES REQUIRE VERIFICATION
INITIAL SETUP:
Tools and Special Tools
Personnel Required
General Mechanics Tool Kit
One
Materials/Parts
Equipment Condition
Equipment
Powered
Down
Power
Source
Disconnected
REMOVAL OF POWER SWITCH:
1. Removing the Power Switch:
a. Disconnect the power cord from the power supply outlet.
b. Disconnect and remove (4) cam covers on the fresh water and Decon solution outlets.
c. Loosen and remove the water supply connector protective cover.
NOTE
Keep pressure against the panel so it doesn’t drop open when removing the bolts.
d. Using a 7/16” open end wrench, loosen and remove the control panel (4) bolts, (4) lock washers and
(4) flat washers. Carefully lower control panel.
e. Disconnect power switch as follows:
1. Remove white wire #024
2. Remove black wire #013
3. Remove black wire #061
f.
Depress the top and bottom tab on the power switch while pushing the switch outward.
g. Remove
switch.
INSTALLATION OF POWER SWITCH:
2. Installing the Power Switch:
a. Insert new power switch into the control panel until it locks into place.
b. Connect the power switch as follows:
1. Install black wire #061.
2. Install black wire #013.
3. Install white wire #024.
Содержание G2 series
Страница 2: ......
Страница 12: ......
Страница 22: ......
Страница 34: ......
Страница 36: ......
Страница 42: ......
Страница 44: ......
Страница 56: ......
Страница 58: ......
Страница 60: ......
Страница 66: ......
Страница 112: ......
Страница 116: ......
Страница 118: ......
Страница 152: ......
Страница 180: ......
Страница 183: ......