Operation & Maintenance w/IPB
G2 Series Decontamination Water Heater
0014
Part Number: 1006375
0014-1
DHS Systems LLC
This document contains information proprietary to DHS Systems LLC and is intended solely for use by its customers. No portion of this document may be reproduced
for release to a third party without written consent of DHS Systems LLC.
OPERATOR MAINTENANCE INSTRUCTIONS
G2 SERIES DECONTAMINATION WATER HEATER
G2 / G2-I EQUIPMENT MAINTENANCE PROCEDURES
GENERAL
This work package provides information needed by the Operator when performing the following services to the G2 /
G2-I Decontamination Water Heater. They consist of:
Remove and Replace Burner Motor Assembly Procedures
Burner Air Adjustment Maintenance Procedures
Remove and Replace Fuel Pump/Solenoid Procedures
Remove and Replace Fuel Pump Flexible Coupling Procedures
Remove and Replace Electronic Igniter Assembly Procedures
Remove and Replace Fuel Nozzle and Electrode Assembly Procedures
Remove and Replace Fuel Tank Assembly Procedures
Remove and Replace Fuel Filter/Water Separator Procedures
Remove and Replace Decon Solution Tank Strainer (G2-I Water Heater ONLY)
Injector Maintenance Procedures (G2-I Water Heater ONLY)
Remove and Replace Power Switch Procedures
Seasonal Maintenance Procedures
WARNING
Voltage sources, in addition to being an electrical shock hazard, may also potentially produce
serious burns. Care should be exercised when using water around exposed power connections.
Ensure that all power to the system has been shut off, disconnected and water heater has cooled
off before disassembling and cleaning the components of the G2 / G2-I Decontamination Water
Heater.
Содержание G2 series
Страница 2: ......
Страница 12: ......
Страница 22: ......
Страница 34: ......
Страница 36: ......
Страница 42: ......
Страница 44: ......
Страница 56: ......
Страница 58: ......
Страница 60: ......
Страница 66: ......
Страница 112: ......
Страница 116: ......
Страница 118: ......
Страница 152: ......
Страница 180: ......
Страница 183: ......