Operation & Maintenance w/IPB
G2 Series Decontamination Water Heater
0014
Part Number: 1006375
0014-15
DHS Systems LLC
This document contains information proprietary to DHS Systems LLC and is intended solely for use by its customers. No portion of this document may be reproduced
for release to a third party without written consent of DHS Systems LLC.
INSTALLATION OF THE FUEL NOZZLE AND ELECTRODE ASSEMBLY (CONT):
f.
Install and tighten splined nut using a splined wrench.
g. Using a 7/16” open end wrench, reconnect and tighten the fuel nozzle tube B-nut.
2. Installing the electronic igniter assembly as follows:
a. Place the electronic igniter and base plate assembly onto the burner motor housing.
b. Using the following sequence, reconnect the igniter wire harness as follows:
1. Reconnect the igniter blue wire to the black #011 main harness wire to the black wire oil burner
wire harness. Twist the three wires together and install a wire nut.
2. Reconnect the igniter white wire to (3) white wires (one from the main wire harness, one from the
oil burner motor and one from the fuel solenoid plug). Twist wires together and install a wire nut.
c. Crimp all wire nuts for added security.
d. Ensure igniter springs make contact with the insulators.
e. Using a 5/16” open end wrench, install and tighten (2) mounting screws on the top to secure the
electronic igniter and base plate assembly.
f.
Using a cross-point screwdriver, install and tighten (2) screws on the bottom to secure the electronic
igniter and base plate assembly.
g. Reconnect the power cord into power supply outlet.
h. Perform operations and leak checks.
END OF TASK
Содержание G2 series
Страница 2: ......
Страница 12: ......
Страница 22: ......
Страница 34: ......
Страница 36: ......
Страница 42: ......
Страница 44: ......
Страница 56: ......
Страница 58: ......
Страница 60: ......
Страница 66: ......
Страница 112: ......
Страница 116: ......
Страница 118: ......
Страница 152: ......
Страница 180: ......
Страница 183: ......