SAMPLE LOADING AND TESTING
/ SDS TEST RESULTS
101
MosaiQ 125 - User Manual - November 2020 - Reference n°: MMSURM.0010.02
8.11.2 END OF A RUN
The SDS assay processing time is 34 minutes.
1 - Before starting a run, the
Idle
message is displayed on the touch screen below the user name.
(MosaiQ 125 “idle” status)
2 - Once a run has started, different messages such as
Maintenance
(during maintenance operation),
Processing
(while
MosaiQ 125
is performing assays) and
Finishing
(while
MosaiQ 125
is finishing
the assays) appear transiently. When the run is completed, the initial
Idle
message is displayed
steadily.
3 - Once a rack has been loaded and samples have been pipetted, the rack can be replaced by a
new rack in the same lane:
Navigate back to the
Sample Loading
icon.
When the upward facing arrow below the corresponding lane has turned green
,
the rack can be removed, and a new rack can be loaded.
8.12
SDS TEST RESULTS
A successful test run will generate test results. The following section provides step-by-step instructions
on how to read the test results of each sample.
The user can read the test results of each sample.
-
1
Tap on the
Results
icon in the navigation bar.
-
2
On the
Finished
sub menu, tap on the desired test result to show the details of the results.
-
3
Scroll down to see older test results, scroll up to see the most recent test results
3
2
1
(selecting test result)