MAINTENANCE
/ DAILY MAINTENANCE TASKS
136
MosaiQ 125 - User Manual - November 2020 - Reference n°: MMSURM.0010.02
12.5.9
PRIME SAMPLE DILUENT 2
This maintenance task primes the
MosaiQ Sample Diluent 2
, to avoid or remove any
bubbles from the lines. To be performed as needed.
For an optimal result please perform this task three times consecutively.
On the touch screen:
1 - Tap on
Maintenance
on the navigation bar.
2 - Tap on
Prime Diluent 2
.
3 - Tap on
Execute Task
on the right side of the screen to start the maintenance.
12.5.10 SHIFT
START
By performing this maintenance task, all results provided during the previous shift are
saved in the archive. To be performed as needed.
On the touch screen:
1 - Tap on
Maintenance
on the navigation bar.
2 - Tap on
Shift Start
.
3 - Tap on
Execute Task
on the right side of the screen to start the maintenance.